Construction & Engineering Insurance

Construction & Engineering Insurance Mozambique

CAR/EAR, DSU and liability for projects in Maputo, Tete, Beira, Nacala and Cabo Delgado.

Berkley Risk (Pty) Ltd • FSP #54407 • We arrange cover with licensed insurers.

Request non-binding terms Speak to a specialist

Construction programmes for Mozambique projects

We arrange Construction & Engineering programmes for projects across Mozambique from Maputo and Beira to Tete and Cabo Delgado. We align CAR/EAR, DSU/ALOP, plant and liability, mapped to your contract and lender requirements. All cover is subject to underwriting and policy wording. See construction & engineering insurance.

Construction & Engineering Insurance

Why do Mozambique projects need aligned construction programmes?

Distance, import lead-times and multi-party contracts make evidence and triggers critical. Correctly aligned C&E cover protects cashflow, satisfies lender covenants and keeps milestones on track—especially on corridor, mining and energy projects.

Who is this page for?

Principals, EPC/EPCM, main contractors, specialist subcontractors and developers delivering projects in Maputo/Matola, Beira, Nacala, Tete/Moatize, Pemba/Palma and along the Nacala/Beira corridors.

What’s typically covered on Mozambique projects?

We structure multi-line programmes. Exact response depends on wording and facts.

Cover Purpose Key watch-outs Evidence lenders look for
CAR/EAR Works, materials, T&C stages Sectional handovers, defects As-built, T&C logs, handover certs
DSU/ALOP Delay impact on revenue/finance Trigger ≠ mere delay; critical items Programme, critical-path proof
Mobile/Hired-in Plant On-site plant/cranes Theft/security; cross-hire Plant list, maintenance records
Single Project Liability Third-party damage/injury Site access, neighbours Method statements, permits
Professional Indemnity (incl. SPPI) Design responsibility Retro dates; sub-consultants Appointments, QA/QC trail
Project Cargo (tie-in) Critical items in transit DSU linkage; storage risks Packing, route, custody docs
Political Violence/Strike SRCC/PV alongside CAR/EAR Wordings/territory Security plans, site logs

Illustrative; wording governs.

How should the policy align with contract form and JV structure?

Map design responsibility, LDs, change control and termination to policy conditions. For JVs/consortia, confirm joint and several obligations, insured parties and waiver/subrogation language so claims don’t stall. If design exposure is material, consider a project-specific tie-in to professional indemnity insurance.

Which lender covenants commonly clash with policies?

Notice periods, DSU triggers, named insureds, step-in rights and co-insurance often misalign. We coordinate lender wording, critical-path evidence and insured parties before bind to avoid non-affirmation at claim time—especially on LNG, mining and corridor projects moving critical cargo via Ressano Garcia/Komatipoort.

Which covers match each Mozambique project stage?

Select instruments per milestone to keep cash and progress flowing.

  • Tender/Award: CAR/EAR placement; bond & guarantee insurance (Performance/Advance Payment guarantees) (if required).
  • Mobilisation: Plant + liability; project cargo for critical items.
  • Works/T&C: CAR/EAR + SPPI; sectional handover rules.
  • PC → DLP: Liability continues; defects period logged; DSU ends at PC per wording.

What information speeds a same-day indication?

  • Role (principal/contractor/designer/JV) and contract form (JBCC/FIDIC/NEC).
  • Project location(s): Maputo/Matola, Tete/Moatize, Beira, Nacala, Pemba/Palma.
  • Sum insureds, sections, critical path and T&C plan.
  • DSU requirement (Y/N) and debt milestones.
  • Plant values/schedule; third-party interfaces.
  • Prior losses and current placements.

We’ll revert with non-binding terms, subject to underwriting and policy wording. You can also Contact Berkley Risk to fast-track.

FAQs

Does DSU/ALOP cover liquidated damages?
Only where an insured delay is proven per wording; LDs themselves aren’t the trigger. Programme and evidence are key.

Can we run a Single Project PI alongside annual PI?
Yes—where design risk and lender demands warrant it; check retro dates and sub-consultant terms.

Is political violence/strike cover part of CAR/EAR?
Often separate or endorsed; territory and wording matter. We’ll structure appropriately.

Will project cargo delays link to DSU?
Sometimes—only for critical items and where wordings connect transit/storage and delay triggers.

Do insurer policies accept JV/consortium arrangements?
Yes—ensure insured parties, joint/several liability and waiver/subrogation are consistent across contract and policy.

Other locations we serve

Berkley Risk arranges Construction & Engineering insurance for businesses across South Africa and selected African markets:

Looking for Construction & Engineering insurance elsewhere?

For a complete view of our Construction & Engineering insurance offering across all sectors and regions, see the Construction & Engineering insurance service overview. To discuss your specific exposure or get a quotation, contact Berkley Risk or call 011-702-8250.

Construction & engineering mozambique

Request non-binding terms

Share the project basics and we’ll revert with non-binding terms—aligned to your contract, JV structure and lender covenants.

Note: All cover is subject to underwriting and policy wording.

We arrange/place/coordinate insurance with licensed insurers. This page provides general information only; all terms are subject to underwriting and policy wording.

Success

Thank you! Form submitted successfully.

This field is required
This field is required
  • General Inquiry
  • Guarantee Insurance
  • Professional Indemnity
  • Specialized Project Insurance
  • Marine Cargo
  • Trade Credit
  • Construction & Engineering
  • Medical Malpractice
  • Commercial and Industrial Risk
  • Public Liability
  • Renewable Energy Insurance
  • Professional Indemnity
  • Specialised Cyber Insurance
  • Specialised Cannabis Insurance
This field is required
This field is required
This field is required